top of page

VGBA 2017 Drain Cover - Advanced Search

Start by selecting from the options below from the pull down menu. Filtered results will appear immediately below. Page will not reload.

Pipe Orientation

Pipe Size

Minimum Sump Depth

Maximum Flow Rate

Filtered Results

Click the model number to view the complete VGBA 2017 specification.

Cover P/N
Orientation
Pipe size
Pipe Depth
FlowRate
32PDxxx
Floor
2.5
0
110
32PDxxx
Floor
2
0
105
32PDxxx
Wall
1.5
0
76
32PDxxx
Wall
2
0
105
6HPHA+615SIxxx
Wall
1.5
0
104
6HPHA+615Txxx
Wall
1.5
0
104
6HPHA+620SIxxx
Wall
2
0
143
6HPHA+620T15Sxxx
Wall
1.5
0
104
6HPHA+6E15Txxx
Wall
1.5
0
104
6HPHA+6HA25T20Sxxx
Wall
2
0
143
6HPHA+RNDxxx
Wall
2
0
143
8MFxxx
Floor
1.5
3
90
Cover Model Number
SOFA Model Number
Sump Port Location
Orientation (Wall and/or Floor)
Pipe size
Sump Depth/Pipe Depth
Design FlowRate (GPM)
32PDxxx
32PD-32f_A-2.5b_B0_C1.25_D.32_E.62_F16
Bottom
Floor
2.5
0
110
32PDxxx
32PD-32f_A-2b_B0_C1.25_D.32_E.62_F16
Bottom
Floor
2
0
105
32PDxxx
32PD-32w_A-1.5b_B0_C1.25_D.32_E.62_F16
Bottom
Wall
1.5
0
76
32PDxxx
32PD-32w_A-2b_B0_C1.25_D.32_E.62_F16
Bottom
Wall
2
0
105
6HPHA+615SIxxx
6HPHA+615SI-6w_A-1.5b_B0_C0_D0_E2.4_F16
Bottom
Wall
1.5
0
104
6HPHA+615Txxx
6HPHA+615T-6w_A-1.5b_B0_C0_D0_E2.37_F16
Bottom
Wall
1.5
0
104
6HPHA+620SIxxx
6HPHA+620SI-6w_A-2b_B0_C0_D0_E2.15_F16
Bottom
Wall
2
0
143
6HPHA+620T15Sxxx
6HPHA+620T15S-6w_A-1.5b_B0_C0_D0_E2.16_F16
Bottom
Wall
1.5
0
104
6HPHA+6E15Txxx
6HPHA+6E15T-6w_A-1.5b_B0_C0_D0_E2.3_F16
Bottom
Wall
1.5
0
104
6HPHA+6HA25T20Sxxx
6HPHA+6HA25T20S-6w_A-2b_B0_C0_D0_E1.8_F16
Bottom
Wall
2
0
143
6HPHA+RNDxxx
6HPHA+RND-6w_A-2b_B0_C0_D0_E1.81_F16
Bottom
Wall
2
0
143
8MFxxx
8MF-8f_A-1.5b_B3_C0.4_D0.4_E1.1_F16
Bottom
Floor
1.5
3
90
Cover Replacement Sales Sheet_041422_Compressed.jpg

Visual Replacement Guide
We Have You Covered

Click the image for important replacement information

Suggested replacements are designed to fit in/over the existing mud frame. Please ensure that the replacement drain cover has an adequate volumetric flow rating to meet the application’s highest flow potential and that the application meets the replacement drain cover’s specifications.

bottom of page