top of page

VGBA 2017 Drain Cover - Advanced Search

Start by selecting from the options below from the pull down menu. Filtered results will appear immediately below. Page will not reload.

Pipe Orientation

Pipe Size

Minimum Sump Depth

Maximum Flow Rate

Filtered Results

Click the model number to view the complete VGBA 2017 specification.

Cover P/N
Orientation
Pipe size
Pipe Depth
FlowRate
A10RCFRxxx
Floor
3
0
138
A10RCFRxxx
Floor
3
3
170
A10RCFRxxx
Floor
3
5.2
240
A10RCFRxxx
Floor
4
0
175
A10RCFRxxx
Floor
4
3
240
A10RCFRxxx
Wall
4
3
225
A10RCFRxxx
Floor
4 & 2.5
5.2
250
A10RCFRxxx
Floor
4
5.2
250
A10RCFRxxx
Floor
6
9.25
200
A10RCFRxxx
Wall
1.5
0
63
A10RCFRxxx
Wall
2.5
0
100
A10RCFRxxx
Wall
2.5
3
170
Cover Model Number
SOFA Model Number
Sump Port Location
Orientation (Wall and/or Floor)
Pipe size
Sump Depth/Pipe Depth
Design FlowRate (GPM)
A10RCFRxxx
A10RCFR-10f_A-3b_B0_C0_D0_E0_F16
NA
Floor
3
0
138
A10RCFRxxx
A10RCFR-10f_A-3b_B3_C0.4_D0.5_E3.25_F16
Bottom
Floor
3
3
170
A10RCFRxxx
A10RCFR-10f_A-3s_B5.2_C0.93_D0.45_E1.7_F16 [4][4]
Side
Floor
3
5.2
240
A10RCFRxxx
A10RCFR-10f_A-4b_B0_C0_D0_E0_F16
NA
Floor
4
0
175
A10RCFRxxx
A10RCFR-10f_A-4b_B3_C0_D0_E0_F16
Bottom
Floor
4
3
240
A10RCFRxxx
A10RCFR-10f_A-4b_B3_C0_D0_E0_F16 - copy
Bottom
Wall
4
3
225
A10RCFRxxx
A10RCFR-10f_A-4s,2.5b_B5.2_C1.1_D1.2_E2.5_F16[4]
Side & Bottom
Floor
4 & 2.5
5.2
250
A10RCFRxxx
A10RCFR-10f_A-4s_B5.2_C1.1_D1.2_E2.5_F16[4]
Side
Floor
4
5.2
250
A10RCFRxxx
A10RCFR-10f_A-6b_B9.25_C0.4_D0.5_E1.7_F16[5]
Bottom
Floor
6
9.25
200
A10RCFRxxx
A10RCFR-10w_A-1.5b_B0_C0_D0_E0_F16
NA
Wall
1.5
0
63
A10RCFRxxx
A10RCFR-10w_A-2.5b_B0_C0_D0_E0_F16
NA
Wall
2.5
0
100
A10RCFRxxx
A10RCFR-10w_A-2.5b_B3_C0.4_D0.5_E3.75_F16
Bottom
Wall
2.5
3
170
Cover Replacement Sales Sheet_041422_Compressed.jpg

Visual Replacement Guide
We Have You Covered

Click the image for important replacement information

Suggested replacements are designed to fit in/over the existing mud frame. Please ensure that the replacement drain cover has an adequate volumetric flow rating to meet the application’s highest flow potential and that the application meets the replacement drain cover’s specifications.

bottom of page